

Horizon Sky
Shaping Engineers in Pharma Facility Project Planning & Construction Project Management…
Learn USA & India Based Pharma Facility Projects Planning & Construction Management For Biologics Bulk Drug, Fill-Finish, LVP-SVP, Injectables, Tablet-Capsule Projects.
Online Training Courses
Pharma Project Planning & Construction Management (USA Region, Biologics)

M1 Basics of Pharma
Project Management
$100

M2 Pharma Facility
Space Planning

M3 Pharma Project
Purchase Management
$150

M4 Phama Project
Construction Management
$150

Pharma Project Planning
& CPM Complete Course
$500
Pharma Project Planning & Construction Management (India Region, LVP-SVP, Injectable, Tablet)

M1 Basics of Pharma
Project Management

M2 Pharma Project
Space Planning

M3 Pharma Project
Purchase Management

M4 Phama Project
Construction Management

Pharma Project Planning &
CPM Complete Course
What Will You Learn.....
M1 Basics of Pharma Project Management:
Basics of Pharma Planning & Construction Project Management:
1. Areas In Pharma Multi Facility Campus With Walk-Through
2. Areas In Pharma Single Facility Campus With Walk-Through
3. Process Flow And Areas In Biologics Bulk Drug Facility
4. Process Flow And Areas In Biologics Fill Finish Facility
5. C.U.B. and Technical Floors Areas
6. Roles Of Architects
7. Roles Of Engineering Design Team
8. Roles Of Client Corporate Team
9. Roles Of Project Management Team
10. Pharma 4.0 A.E.C. Perspectives
11. Project Set-Up Chronology
1. Areas In Pharma Multi Facility Campus With Walk-Through
2. Areas In Pharma Single Facility Campus With Walk-Through
3. Process Flow And Areas In Biologics Bulk Drug Facility
4. Process Flow And Areas In Biologics Fill Finish Facility
5. C.U.B. and Technical Floors Areas
6. Roles Of Architects
7. Roles Of Engineering Design Team
8. Roles Of Client Corporate Team
9. Roles Of Project Management Team
10. Pharma 4.0 A.E.C. Perspectives
11. Project Set-Up Chronology
M2 Pharma Facility Space Planning:
1. Types of Drawings Used
2. Software For Project Design and Management
3. User Specific Requirements USR & Room Data Sheets
4. Planning for Manufacturing Plants & Ware House
5. Planning of QC Labs & PD Labs
6. Planning of CUB & Technical Floors
7. Electrical Distribution
8. HVAC Planning
9. Utility And Process Piping Distribution
10. Campus Architecture Master Planning
11. Sample Layout of Biologics Bulk Drug Facility
12. Sample Layout of Biologics Fill Finish Facility
13. Introduction to BIM and 3D modeling
2. Software For Project Design and Management
3. User Specific Requirements USR & Room Data Sheets
4. Planning for Manufacturing Plants & Ware House
5. Planning of QC Labs & PD Labs
6. Planning of CUB & Technical Floors
7. Electrical Distribution
8. HVAC Planning
9. Utility And Process Piping Distribution
10. Campus Architecture Master Planning
11. Sample Layout of Biologics Bulk Drug Facility
12. Sample Layout of Biologics Fill Finish Facility
13. Introduction to BIM and 3D modeling
M3 Purchase Management:
1. Block Budgeting and CAPEX planning with examples for projects ranging from 300,000 to 400,000 square feet
2. Cost Head and items executed in projects for Site, Building, Interior finishes, Electrical, Plumbing, HVAC, Piping, Process etc.
3. Detailed Project Report (DPR)
4. Equipments procurement & Vendor purchase orders
5. Contract agreements for contractors and sub-contractors
6. Service agreements of consultants for Design, PMC, Town passing approvals, CQV etc.
7. Cash Flow Monitoring CFM
2. Cost Head and items executed in projects for Site, Building, Interior finishes, Electrical, Plumbing, HVAC, Piping, Process etc.
3. Detailed Project Report (DPR)
4. Equipments procurement & Vendor purchase orders
5. Contract agreements for contractors and sub-contractors
6. Service agreements of consultants for Design, PMC, Town passing approvals, CQV etc.
7. Cash Flow Monitoring CFM
M4 Construction Management:
1. Activity scheduling
2. Site work
3. Building Work
4. Clean room construction
5. HVAC installations
6. Plumbing
7. Utility and process piping
8. Electrification
9. Fire stopping and Fire Proofing
10. Instrumentation, control and Automation
11. Interior furnishing
12. Site Store Management
13. CQV (Commissioning, Qualification, and Validation)
14. Town Approvals
15. Project Closeout
2. Site work
3. Building Work
4. Clean room construction
5. HVAC installations
6. Plumbing
7. Utility and process piping
8. Electrification
9. Fire stopping and Fire Proofing
10. Instrumentation, control and Automation
11. Interior furnishing
12. Site Store Management
13. CQV (Commissioning, Qualification, and Validation)
14. Town Approvals
15. Project Closeout
Previous slide
Next slide
Student Discount....

To avail Student Discount, The proof of student status to be emailed to horizonskygrp@gmail.com.The proof should be any of current or passed out semester schedule, transcript, university letter, student ID card or any other document showing status. At present student discount is 50%.
Guidence Documents (Included In Course)

Basics of Pharma Project Planning & CPM E-Book
Amazon Kindle Link ($50)
Horizon Sky Introduction....
About Us
Welcome to Horizon Sky: Pharma Project Planning & Construction Project Management Training
At Horizon Sky, we specialize in training engineers, architects, and professionals in the intricacies of pharma facility project planning and construction management for global facilities.
Our programs cater to diverse regional needs:
USA-based Programs: Focus on Biologics Bulk Drug and Fill Finish Facilities.
India-based Programs: Cover IV Fluids (PP-PE LVP, SVP), Glass Vial-Ampoules Injectables and Tablet & Capsule Formulation Facilities.